Announcement

Collapse
No announcement yet.

New Hayward revealed

Collapse

Unconfigured Ad Widget

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • gh
    replied
    salvage plans

    https://around.uoregon.edu/content/p...ce=ato08-15-18

    Leave a comment:


  • Conor Dary
    replied
    Asked some guy on the site today when the track was going down... He shrugged with a look like he didn't have a clue what I was talking about... I didn't tell him about the 47:02....

    Leave a comment:


  • 26mi235
    replied
    When are the other two coming out?

    Leave a comment:


  • Conor Dary
    replied
    Originally posted by lonewolf View Post
    Presumably, a 30,000 seat stadium warrants a deep seated foundation.
    Indeed....The foundation is coming along...

    Leave a comment:


  • lonewolf
    replied
    I appreciate Conor keeping us posted.

    Leave a comment:


  • Conor Dary
    replied
    Originally posted by bambam1729 View Post
    Stunned. Just opened this section of the message board, and noted there was a new post on the Hayward Field thread - and it wasn't from Conor Dary!
    Amazing....

    Leave a comment:


  • bambam1729
    replied
    Stunned. Just opened this section of the message board, and noted there was a new post on the Hayward Field thread - and it wasn't from Conor Dary!

    Leave a comment:


  • lonewolf
    replied
    Presumably, a 30,000 seat stadium warrants a deep seated foundation.

    Leave a comment:


  • polevaultpower
    replied
    Originally posted by gh View Post
    e-mail from a Eugene subscriber (I don't know him) today:

    <<I was surprised to see construction activity (excavation) today Saturday.

    A construction person came over to chat.

    Some tidbits...

    K&E Excavation was averaging 750 cubic yards dirt removal per hour yesterday (60-75 dump truck loads per hour out), and the trucks were also bringing in gravel fill. !!!!

    The track, which the trucks have using as a convenient highway, will be removed in ~ 1 week.

    Pilings will start to go in in ~ 2 weeks.

    Your Hayward Field construction site whisperer.....>>
    Pilings? Is it sinking like the track at UW? lol

    Leave a comment:


  • DrJay
    replied
    Originally posted by bad hammy View Post
    The view a few years ago, from the RG's look at the 40th anniversary of Animal House:

    http://gatehousenews.com/animalhouse...isterguard.com
    What an awesome link! Thanks!!

    Leave a comment:


  • Conor Dary
    replied
    Filling in the infield today... So any bodies buried there are gone now...

    Leave a comment:


  • Conor Dary
    replied
    Yes...Indeed...the memories of filming Animal House...I remember seeing that white horse...amazing how much open space there was near Hayward then..

    Leave a comment:


  • bad hammy
    replied
    The view a few years ago, from the RG's look at the 40th anniversary of Animal House:



    http://gatehousenews.com/animalhouse...isterguard.com

    Leave a comment:


  • Conor Dary
    replied
    Originally posted by DrJay View Post
    Conor, thanks for the pics. A weekly (or thereabouts) one would be really welcome over the next 20 months.

    I hope there are no plans to level and rebuild the Wild Duck. :-)
    I will...I go by every day..I'm trying to shoot through the same hole in the fence to get consistency...

    Wild Duck is still there with no plans to change...The university doesn't own it...thank god...

    Leave a comment:


  • DrJay
    replied
    Conor, thanks for the pics. A weekly (or thereabouts) one would be really welcome over the next 20 months.

    I hope there are no plans to level and rebuild the Wild Duck. :-)

    Leave a comment:

Working...
X